XAYABURI: THE FIRST DOMINO IN THE SERIES OF MAINSTREAM DAMS IN THE LOWER MEKONG BASIN
12

To the Friends of the Mekong
& VN 2020 Mekong Group

If the Xayaburi Dam’s construction cannot be postponed for at least a decade, it would be the first domino to fall and open the door for the building of a host of dams downstream. Their immediate, devastating and long lasting impacts on the entire ecosystem of the Mekong and Mekong Delta will not be easily determined.

THE HISTORY OF DAMS DOWNSTREAM THE MEKONG

Since the 1940’s, the potentials for hydroelectric production of the Mekong have attracted the intense attention of American dam builders. In the midst of the cold war, in 1957, the Mekong River Committee was established under the auspices of the United Nations. It maintained a permanent office in Bangkok and consisted of four member nations: Cambodia, Laos, Thailand and Vietnam. At that early stage, the Committee had adopted a comprehensive development plan to improve the lives of all the inhabitants in the Basin including the building of a series of hydroelectric dams downstream the river. Even though half of the Mekong’s current meanders through Yunnan Province, China at that time was a closed society which went undetected on the radar screen of the world.

For over thirty years the Vietnam War spread its tentacles to the three countries of Indochina. Consequently, the building of large hydroelectric dams downstream the Mekong current and other development projects had to be put on hold allowing the Mekong to retain her pristine state for some more time.

On April 5, 1995 the Mekong River Commission which was the reincarnation of the defunct Mekong River Committee met in Chiang Rai, Thailand. During that meeting, the Vietnamese Foreign Minister Mr. Nguyễn Mạnh Cầm signed “The Agreement on the Cooperation for the Sustainable Development of the Mekong River Basin”. [9]

A fundamental modification was adopted by the Commission: It revoked the veto power the Mekong River Committee gave to its members. More than a decade ago, this author had ventured the observation that this Commission is only a “poor and downgraded version” of the former Mekong River Committee.[10]

The projects to build hydroelectric dams on the Lower Mekong have come into existence since the time of the Mekong River Committee. The construction sites for those dams were once again endorsed by the Canadian and French consultants and published by the Mekong Secretariat in 1994. However, those projects were temporarily shelved on account of their costs as well as of their negative impacts on the ecology.

Beginning in 2006; companies from Malaysia, Thailand, and China were given the green light to carry out feasibility studies for the “run-of-river” dams on the Lower Mekong. Below is the listing of the eleven dams in geographical order from north to south:

  1. Pak Beng Dam, Laos 1,320 MW; project sponsors: Chinese company Datang International Power Generation Co. and Laotian government.

  2. Luang Prabang Dam, Laos 1,410 MW; project sponsors: Vietnamese company Petrovietnam Power Co. and Laotian government.

  3. Xayaburi Dam, Laos, 1.260 MW, Xayaburi Province, Laos; project sponsors: Thai company Ch. Karnchang and Laotian government.

  4. Pak Lay Dam, Laos, 1,320 MW Xayaburi Province, Laos; project sponsor: Chinese company Sinohydro Co. June, 2007 to carry out the feasibility studies.

  5. Xanakham Dam, Laos, 1,000MW; project sponsor: Chinese company Datang International Power Generation Co

  6. Pak Cho Dam, Lao-Thai borders, 1,079 MW

  7. Ban Koum Dam, Lao-Thai borders, 2,230 MW, Ubon Ratchathani Province; project sponsors: Italian-Thai Development Co., Ltd and Asia Corp Holdings Ltd. and Laotian government.

  8. Lat Sua Dam, Laos, 800 MW; project sponsors: Thai companies Charoen Energy and Water Asia Co. Ltd., and Laotian government.

  9. Don Sahong Dam, 360 MW, Champasak Provimce, Laos; project sponsor: Malaysian company Mega First Berhad Co.

  10. Stung Treng Dam, Cambodia, 980 MW; project sponsor: Russian government.

  11. Sambor Dam, Cambodia; project sponsor: Chinese company China Southern Power Grid Co. (CSPG).

Beijing is implementing its plan to build 14 dams on the Upper Mekong in Yunnan Province. Currently, it also has a hand in the building of four additional ones in the Lower Mekong. The Chinese company Datang International Power Generation Co is involved in the construction of the Myanmar’s Myitsone Dam (6,000 MW), on the Irrawaddy. This is the largest and most controversial of all the dam projects in Southeast Asia.

Motivated by short-term interest, Vietnam is sponsoring the Luang Prabang Dam Project (1,410 MW) which is larger than the Xayaburi Dam. [1]

XAYABURI – THE FIRST DAM

This is the first dam to be built on the Mekong’s main current, 350 km to the north of Vientiane, 770 km south of Jinhong in the series of dams in the Yunnan Cascades of China and 150 km south of Luang Prabang. It ranks among the 300 largest dams of the world.


[ Figure I – The dams on the main current of the Mekong
Source: Stimson Center ]

The vital statistics of this dam are as follows: 830 metres wide, 49 m tall, 49 km2 in area, two fish passes, and a navigation lock. Its construction costs are reported at US$ 3.5 billion with a projected output of 1,260 MW. The expected date of operation is set for 2019 when 95% of the generated electricity will be diverted to the Thai city of Loei through a power grid network extending over a distance of 200 km. The prospects for the Xayaburi dam to operate in the long run still remains a big question mark because the large volume of alluvia that will be retained by the dam can quickly fill its reservoir. Below is the schedule for implementation of the project:

May, 2007: the Laotian government signed the contract with the Thai company Ch. Karnchang to build the Xayaburi Dam.

November, 2008: the company AF Calenco of Switzerland started the feasibility study of the dam in collaboration with Thai consultants.

February, 2010: the Environmental Impact Assessment (EIA) was submitted to the Lao government.

July, 2010: the Lao government officially signed the agreement to sell the power generated by the Xayaburi Dam to Thailand with the Electricity Generating Authority of Thailand (EGAT).

April, 2011: the Joint Committee of the Mekong River Commission (MRC/JC) issued a press release that the MRC member countries had not reached a common agreement to start the implementation of the Xayaburi Project. [8]

June, 2011: the Laotian government unilaterally gave the “green light” to the company Ch. Karnchang of Thailand to start the project giving rise to a crisis of confidence among the member countries in the regional attempt to conserve the Mekong’s environment.

Even though the 1995 Convention of the Mekong River Commission (MRC) revoked the veto power of the member countries (that was recognized by the defunct Mekong River Committee), all projects involving the Mekong must go through these three PNPCA stages: (1) Procedures of Notification, (2) Prior Consultation, (3) Agreement. It can be said that the Xayaburi is the very first project to undergo the regional decision-making process of the PNPCA.

Probably, we should pause at this point to review the conventions and time frame applied to each of the three steps in the PNCPA process as defined in the 1995 Convention of the Mekong River Commission: (1) Procedures for Notification (PN) the Mekong River Commission was officially notified by the Laotian government of the Xayaburi Dam Project since September of 2010. (2) Prior Consultation (PC) as specified by the article 5.5.1 the time frame allotted to the Prior Consultation step is six months counting from the day the Notification is received. However, in case a consensus cannot be reached by the member countries, article 5.5.2 allows for the Joint Committee of the Mekong River Commission to extend this six month period.

The Lao government holds to the opinion that there is no certainty for the trans-boundary impacts of the Xayaburi Dam on the countries downstream to ever take place. Consequently, it would neither be practical nor necessary to grant an extension of the Prior Consultation period. Moreover, even if we prolong the time for additional consultation, it will not possible to satisfy all parties’ concerns. [8]

We cannot guarantee all the concerns raised by the member countries would be addressed.

The head of the Lao delegation, Mr. Viraphonh Viravong, stated: “We appreciate all comments, but we will consider to accommodate all concerns”. He went on to give the assurance that all building guidelines stipulated by the Mekong River Commission’s Secretariat would be observed. In addition, his government would also give top priority to the implementation of international criteria to minimize the nefarious impacts on all aspects of the project be it waterway transportation, fish migration, alluvium deposits, water quality, water ecology or even dam safety at acceptable levels.

However, as far as the other member countries like Vietnam, Cambodia, and Thailand are concerned, they still harbor some reservations about the technical drawbacks of the project. They do not feel fully reassured about the assessments of the project’s impacts on the ecology and the lives of the inhabitants of the Basin. Therefore, they believe it is imperative to conduct further consultations with the affected population.

According to the Vietnamese delegation, there exists a need to perform a satisfactory assessment of the trans-boundary and accumulative impacts on the region downstream the river in particular the Mekong Delta. The six month period is not sufficient for the nations along the river current to conduct comprehensive studies to evaluate the accumulative impacts the Xayaburi Dam may cause. Vietnam proposes a moratorium of at least ten years for all dam projects in the Lower Mekong.

As for the Cambodian delegation, it argues that more time is needed for a meaningful and effective dialogue between the member countries and affected population during the Prior Consultation stage. Besides emphasizing the necessity to complete the studies and evaluations of the far-reaching impacts of the Xayaburi Dam on the environment, this delegation introduces the quite novel idea of “sharing” the benefits derived from the dams to set up “social funds” to pay for the conservation of the environment in the affected nations.

Despite the fact that, along with Laos, Thailand benefits greatly from the electricity generated by the Xayaburi Dam, this nation recognizes that the dam plays a major role in the economic development of Laos. Furthermore, the Thai delegation also acknowledges that the problem of ecological degradation resulting in flooding and loss of fishing revenues must be reckoned with because it affects the lives of the inhabitants along the Mekong’s current. Jatuporn Buruspat, Director General of the Thai Department of Water Resources, expresses his empathy with the Thai citizens with these words: “Therefore, we would like to see that public views and concerns are well taken into consideration,” [8]

The Xayaburi Project is the first of the twelve to be implemented in the Lower Mekong and also the first outside of China. Preliminary assessments show that over 200,000 individuals will be directly affected by the dam including the 2,100 villagers who will face forced relocation because their homes are located directly at the construction site. And there are other millions of Cambodians, Lao, and Vietnamese who will also suffer as they depend on the water and fish of the Mekong for their existence.

In the face of uncertainties and those evident losses, the question that comes to mind is: who are the promoting forces behind the implementation of the Xayaburi Project? Who else but the Thai capitalists and dam building companies! The financial players are represented by four big banks: Kasikorn Bank, Bangkok Bank, Krung Thai Bank and Siam Commercial Bank. The dam company is Thai Construction Company Ch. Karnchang. According to plan, 95% of the generated power will be diverted to Thailand and sold to the Electricity Generating Authority of Thailand (EGAT).

SAVE THE MEKONG AND THE PETITIONS

March, 2011: the most compelling petition was sent by the organization SavetheMekong.org to the Prime Ministers of Laos and Thailand with the request to cancel not to postpone the Xayaburi Project. The reasons cited for the request are: the devastation of the region’s ecology and the impacts caused by the dam will represent permanent losses to the life sources of the local population as well as to the Mekong, one of the most precious rivers of this planet, itself.

With over 1,000 species, the fish source of the Mekong ranks second only to that of the Amazon and the Xayaburi Dam will put an end to the migration of more than 23 fish species. It also threatens to bring about the extinction of 41 fish species including the Pla Beuks or Mekong Giant Catfish and the Irrawaddy Dolphins considered the flagship species that is used as an indicator of the sound state of the Mekong’s eco-system.

Ame Trandem, Southeast Asia Program Director, of the International Rivers Network shared the same view: “If the Xayaburi Dam is built it would open the floodgates to other mainstream dams, which would irreversibly alter the entire river ecosystem.” [4]

April of 2011: on account of the widespread opposition displayed by the inhabitants of the Lower Mekong and local as well as international environmental organizations, the governments in the region had to postpone the decision to build the Xayaburi Dam. Unfortunately, with the tacit approval of the Lao government, the Thai dam building company is still quietly proceeding with its works on the project.

The proof is just recently (09/19/2011), a reporter of the Bangkok Post reported that on a trip to the Xayaburi construction site he saw with his own eyes that all the heavy equipments including backhoes were still being used in the building of the almost completed (over 90%) road leading to the dam site.


[ Figure II: The still active construction site of the Xayaburi Dam
Source: International River Network ]

Viraphonh Viravong, Director General of the Laotian Department of Electricity tries his best to explain away this discrepancy in if not blatant violation of the official decision: “It goes without saying that the road will only be used after the Xayaburi project is given the go ahead again. Failing that, all facilities will revert to the use of the local authorities providing its officials with easy access to the remote villages.” [3]

12
Views: 8101

Items with the same category
  1. LAOS PDR BREAKS GROUND <br> FOR XAYABURI DAM <br> A TRAGIC DAY FOR THE MEKONG RIVER <br> AND MEKONG DELTA - 12/3/2012
  2. LỄ ĐỘNG THỔ ĐẬP XAYABURI<br> MỘT NGÀY ẢM ĐẠM <br> TRÊN SÔNG MEKONG VÀ ĐBSCL - 11/20/2012
  3. THE LOWER MEKONG INITIATIVE 2020 AND A MEKONG INSTITUTE IN LAOS PDR - 9/11/2012
  4. SÁNG KIẾN HẠ LƯU MEKONG 2020 VÀ MỘT HỌC VIỆN MEKONG TRÊN ĐẤT LÀO - 8/17/2012
  5. THE MEKONG BASIN A CHALLENGING NEIGHBORHOOD FOR THE U.S - 4/22/2012
  6. LƯU VỰC SÔNG MEKONG<br> ĐỊA BÀN THÁCH ĐỐ CỦA HOA KỲ - 4/13/2012
  7. Hỡi anh đi đường cái quan - 4/1/2012
  8. DIKE BUILDING AND AGRICULTURAL TRANSFORMATION IN THE MEKONG DELTA, VIETNAM: DILEMMAS IN WATER MANAGEMENT - 3/20/2012
  9. Mekong Sea Dike Concept Paper - 3/17/2012
  10. THE WORLD WATER DAY 2012<br> AND THE FOOD SECURITY IN THE MEKONG BASIN - 3/3/2012
  11. NGÀY NƯỚC THẾ GIỚI 2012<br> VÀ AN NINH LƯƠNG THỰC LƯU VỰC SÔNG MEKONG - 2/26/2012
  12. THE MEKONG RIVER AT RISK 2012 <br> WITH THE “SPIRIT OF THE MEKONG” <br> WE WILL TOGETHER DEVELOP THE BASIN - 2/18/2012
  13. SÔNG MEKONG TRƯỚC NGUY CƠ 2012 VỚI “TINH THẦN MEKONG” LƯU VỰC CHÚNG TA CÙNG PHÁT TRIỂN - 1/28/2012
  14. The Siem Reap Meeting <br> A Fragile Agreement [12-08-2011] <br> for the Free Flowing of the Mekong’s Mainstream - 1/3/2012
  15. Hội Nghị Siem Reap <br> Một Thỏa Hiệp Mong Manh [08-12-2011] <br> Cho Dòng Chính Mekong Không Nghẽn Mạch - 12/29/2011
  16. XAYABURI: THE FIRST DOMINO IN THE SERIES OF MAINSTREAM DAMS IN THE LOWER MEKONG BASIN - 11/30/2011
  17. Dự án xây đập thủy điện Don Sahong (Nam Lào) và ảnh hưởng môi trường - 11/24/2011
  18. XAYABURI: CON CỜ DOMINO<br> TRONG CHUỖI ĐẬP MEKONG HẠ LƯU - 11/22/2011
  19. A NEW DAWN ON THE IRRAWADDY: <br> From the Myitsone Dam to the Series of Dams on the Mekong - 11/21/2011
  20. NGÀY MỚI TRÊN SÔNG IRRAWADDY<br>Từ Con Đập Myitsone Tới Chuỗi Đập Sông Mekong - 10/30/2011
  21. FROM THE MULTI-PURPOSE SEA DYKE TO THE FRESH WATER RESERVOIRS IN THE MEKONG DELTA - 7/17/2011
  22. TỪ CON ĐÊ BIỂN ĐA DỤNG NGĂN MẶN TỚI CÁC HỒ CHỨA NƯỚC NGỌT ĐỒNG BẰNG SÔNG CỬU LONG - 6/28/2011
  23. A SUMMARY THE MULTI-PURPOSE SEA DYKE - THE MEKONG DELTA <br>A POSSE AD ESSE – FROM POSSIBILITY TO REALIZATION - 5/28/2011
  24. MEKONG-CỬU LONG 2011NHÌN XA NỬA THẾ KỶ TỚI [2]<br> PHÁC THẢO DỰ ÁNĐÊ BIỂN ĐA DỤNG ĐỒNG BẰNG SÔNG CỬU LONG<br> A POSSE AD ESSE / TỪ KHẢ NĂNG TỚI HIỆN THỰC - 5/8/2011
  25. ĐẤT NƯỚC TA LIỀN MỘT DẢI<br> MỤC NAM QUAN ĐẾN MŨI CÀ MAU - 4/17/2011
  26. MEKONG – THE OCCLUDING RIVER - 3/19/2011
  27. Lancang-Mekong Initiative<br> A foundation for the long term cooperation and prosperity for China and ASEAN - 2/24/2011
  28. MEKONG – CỬU LONG 2011<br> A LOOK FORWARD <br> INTO THE NEXT HALF CENTURY - 2/19/2011
  29. Global Ecology And the “Made in China” Dams - 1/30/2011
  30. MEKONG-CỬU LONG 2011<br> NHÌN XA NỬA THẾ KỶ TỚI - 1/30/2011
  31. Thực trạng bi đát của Lưu Vực sông Mekong<br> Phải cứu sông Cửu Long bằng<br> Sáng kiến Lancang-Mekong - 1/30/2011
  32. PRIME MINISTER HUN SEN AND THE WORST ECOLOGICAL DISASTER WHEN “THE HEART OF THE TONLE SAP” CEASES TO BEAT - 1/15/2011
  33. THE MEKONG AND MISSISSIPPI SISTER-RIVER PARTNERSHIP Similarities and Differences - 1/15/2011
  34. THỦ TƯỚNG HUN SEN VỚI THẢM HỌA MÔI SINH LỚN NHẤT KHI “TRÁI TIM BIỂN HỒ” NGƯNG ĐẬP - 12/5/2010
  35. THỦY ĐIỆN VÀ VẤN ĐỀ LŨ LỤT Ở VIỆT NAM - 11/16/2010
  36. MEKONG DÒNG SÔNG NGHẼN MẠCH - 11/7/2010
  37. SINH CẢNH TOÀN CẦU VÀ NHỮNG CON ĐẬP “MADE IN CHINA” - 6/30/2010
  38. Vị trí Bạch Long Vĩ trên bản đồ Vịnh Bắc Bộ theo Hiệp Định Việt-Trung Năm 2000 và Google Earth - 4/19/2010
  39. Khai thác thủy điện Lan Thương giang - Những hứa hẹn của Trung Quốc và quan điểm hạ nguồn - 4/17/2010
  40. HAI DÒNG SÔNG KẾT NGHĨA MEKONG – MISSISSIPPI NHỮNG TƯƠNG ĐỒNG VÀ KHÁC BIỆT - 12/4/2009
  41. A Vương – Nỗi Sầu Xứ Quảng Cứu lụt năm nay đừng quên tránh lụt năm sau - 11/6/2009
  42. Học giả và chuyên gia môi sinh Trung Quốc lên tiếng về độ an toàn của các đập nước trong vùng địa chấn Tây Nam Trung Quốc, kể cả Lan Thương (Mekong) - 10/10/2009
  43. NHỮNG CON ĐẬP LAN THƯƠNG* TRÊN VÙNG ĐỘNG ĐẤT VÂN NAM - 10/10/2009
  44. PHÁ GHỀNH THÁC/ MỞ RỘNG LÒNG SÔNG/ HỦY HOẠI SINH CẢNH: NGUỒN CÁ SÔNG MEKONG ĐANG CHẾT DẦN - 9/23/2009
  45. CALL FOR HYDROPOWER DAM SAFETY REASSESSMENT - 9/21/2009
  46. Mekong Trên Đường Suy Thoái - 8/28/2009
  47. MEKONG 2009<br> DÒNG SÔNG CÂM NÍN<br> MỘT TRUNG QUỐC ĐI SAU VỀ TRƯỚC - 8/2/2009
  48. MÙA XUÂN VÀ CÂU CHUYỆN CỦA DÒNG SÔNG - 2/4/2006
  49. Khí hậu và hiện tượng El Nino - 7/18/2005
  50. Lâm Ấp, Champa và di sản - 7/18/2005
  51. Mekong Dòng Sông Tranh Chấp - 7/18/2005

Items with the same author
  1. LAOS PDR BREAKS GROUND <br> FOR XAYABURI DAM <br> A TRAGIC DAY FOR THE MEKONG RIVER <br> AND MEKONG DELTA - 12/3/2012
  2. LỄ ĐỘNG THỔ ĐẬP XAYABURI<br> MỘT NGÀY ẢM ĐẠM <br> TRÊN SÔNG MEKONG VÀ ĐBSCL - 11/20/2012
  3. THE LOWER MEKONG INITIATIVE 2020 AND A MEKONG INSTITUTE IN LAOS PDR - 9/11/2012
  4. SÁNG KIẾN HẠ LƯU MEKONG 2020 VÀ MỘT HỌC VIỆN MEKONG TRÊN ĐẤT LÀO - 8/17/2012
  5. THE MEKONG BASIN A CHALLENGING NEIGHBORHOOD FOR THE U.S - 4/22/2012
  6. LƯU VỰC SÔNG MEKONG<br> ĐỊA BÀN THÁCH ĐỐ CỦA HOA KỲ - 4/13/2012
  7. THE WORLD WATER DAY 2012<br> AND THE FOOD SECURITY IN THE MEKONG BASIN - 3/3/2012
  8. NGÀY NƯỚC THẾ GIỚI 2012<br> VÀ AN NINH LƯƠNG THỰC LƯU VỰC SÔNG MEKONG - 2/26/2012
  9. THE MEKONG RIVER AT RISK 2012 <br> WITH THE “SPIRIT OF THE MEKONG” <br> WE WILL TOGETHER DEVELOP THE BASIN - 2/18/2012
  10. SÔNG MEKONG TRƯỚC NGUY CƠ 2012 VỚI “TINH THẦN MEKONG” LƯU VỰC CHÚNG TA CÙNG PHÁT TRIỂN - 1/28/2012
  11. The Siem Reap Meeting <br> A Fragile Agreement [12-08-2011] <br> for the Free Flowing of the Mekong’s Mainstream - 1/3/2012
  12. Hội Nghị Siem Reap <br> Một Thỏa Hiệp Mong Manh [08-12-2011] <br> Cho Dòng Chính Mekong Không Nghẽn Mạch - 12/29/2011
  13. XAYABURI: THE FIRST DOMINO IN THE SERIES OF MAINSTREAM DAMS IN THE LOWER MEKONG BASIN - 11/30/2011
  14. XAYABURI: CON CỜ DOMINO<br> TRONG CHUỖI ĐẬP MEKONG HẠ LƯU - 11/22/2011
  15. A NEW DAWN ON THE IRRAWADDY: <br> From the Myitsone Dam to the Series of Dams on the Mekong - 11/21/2011
  16. NGÀY MỚI TRÊN SÔNG IRRAWADDY<br>Từ Con Đập Myitsone Tới Chuỗi Đập Sông Mekong - 10/30/2011
  17. FROM THE MULTI-PURPOSE SEA DYKE TO THE FRESH WATER RESERVOIRS IN THE MEKONG DELTA - 7/17/2011
  18. TỪ CON ĐÊ BIỂN ĐA DỤNG NGĂN MẶN TỚI CÁC HỒ CHỨA NƯỚC NGỌT ĐỒNG BẰNG SÔNG CỬU LONG - 6/28/2011
  19. A SUMMARY THE MULTI-PURPOSE SEA DYKE - THE MEKONG DELTA <br>A POSSE AD ESSE – FROM POSSIBILITY TO REALIZATION - 5/28/2011
  20. MEKONG-CỬU LONG 2011NHÌN XA NỬA THẾ KỶ TỚI [2]<br> PHÁC THẢO DỰ ÁNĐÊ BIỂN ĐA DỤNG ĐỒNG BẰNG SÔNG CỬU LONG<br> A POSSE AD ESSE / TỪ KHẢ NĂNG TỚI HIỆN THỰC - 5/8/2011
  21. MEKONG – THE OCCLUDING RIVER - 3/19/2011
  22. MEKONG – CỬU LONG 2011<br> A LOOK FORWARD <br> INTO THE NEXT HALF CENTURY - 2/19/2011
  23. Global Ecology And the “Made in China” Dams - 1/30/2011
  24. MEKONG-CỬU LONG 2011<br> NHÌN XA NỬA THẾ KỶ TỚI - 1/30/2011
  25. PRIME MINISTER HUN SEN AND THE WORST ECOLOGICAL DISASTER WHEN “THE HEART OF THE TONLE SAP” CEASES TO BEAT - 1/15/2011
  26. THE MEKONG AND MISSISSIPPI SISTER-RIVER PARTNERSHIP Similarities and Differences - 1/15/2011
  27. THỦ TƯỚNG HUN SEN VỚI THẢM HỌA MÔI SINH LỚN NHẤT KHI “TRÁI TIM BIỂN HỒ” NGƯNG ĐẬP - 12/5/2010
  28. SINH CẢNH TOÀN CẦU VÀ NHỮNG CON ĐẬP “MADE IN CHINA” - 6/30/2010
  29. HAI DÒNG SÔNG KẾT NGHĨA MEKONG – MISSISSIPPI NHỮNG TƯƠNG ĐỒNG VÀ KHÁC BIỆT - 12/4/2009
  30. NHỮNG CON ĐẬP LAN THƯƠNG* TRÊN VÙNG ĐỘNG ĐẤT VÂN NAM - 10/10/2009
  31. PHÁ GHỀNH THÁC/ MỞ RỘNG LÒNG SÔNG/ HỦY HOẠI SINH CẢNH: NGUỒN CÁ SÔNG MEKONG ĐANG CHẾT DẦN - 9/23/2009
  32. MEKONG 2009<br> DÒNG SÔNG CÂM NÍN<br> MỘT TRUNG QUỐC ĐI SAU VỀ TRƯỚC - 8/2/2009
  33. NỬA THẾ KỶ 1957 - 2007 TỪ ỦY BAN TỚI ỦY HỘI SÔNG MEKONG - 10/14/2007
  34. MÙA XUÂN VÀ CÂU CHUYỆN CỦA DÒNG SÔNG - 2/4/2006